Woodworking plan · No. 27

Picture Ledge

Draft · not yet checked by a carpenter

A shallow shelf with a lip for leaning photos and art. Three pieces, glue and a few screws, hung into two studs.

Skill
Beginner
Build time
About 1 hour, plus finish
Lumber
1 1x4 and 1 1x2
Joinery
Glue, screws and brads
Finished size
35″ W × 5″ D × 3½″ H
Drag to spin · pinch or scroll to zoom

What you need

Lumber sizes

A 1x4 is actually ¾″ × 3½″ and a 1x2 is ¾″ × 1½″. Every measurement in this plan uses the real size.

Shopping list

  • 11x4, 6 ftSelect pine or poplar.
  • 11x2, 6 ftFor the lip.
  • 41¼″ wood screws
  • 41¼″ brad nails
  • 22½″ screwsFor mounting into studs.
  • 1Wood glue
  • —Wood filler and sandpaper, 120 and 180 grit
  • opt.Paint or stain

Tools

  • SawMiter saw, circular saw or hand saw.
  • Drill/driverWith a ⅛″ bit for pilot holes.
  • Hammer and nail set
  • Stud finder and level
  • Tape measure, pencil

Cut list

Three pieces from two boards. Label each piece with its letter in pencil as you cut it.

PartQtySize, inchesFrom
ABack1¾ × 3½ × 351x4
BBottom1¾ × 3½ × 351x4
CLip1¾ × 1½ × 351x2

Board layout. Each row is one board, cut left to right, with the remainder hatched. Dark lines are saw cuts, about ⅛″ wide.

Build it

Five steps. The 3D view follows along as you scroll. The parts you're working on are yellow, and the screws and nails for that step are red.

Step 1 of 5Cut the pieces
  1. 01

    Cut the pieces

    Cut the three pieces to the same length:

    • A Back, one at 35″
    • B Bottom, one at 35″
    • C Lip, one at 35″
  2. 02

    Join the back and the bottom

    Stand the back (A) on edge and butt the bottom (B) against its front face, bottoms flush. Glue the joint, then pre-drill and drive four 1¼″ screws through the back into the edge of the bottom.

  3. 03

    Add the lip

    Glue the lip (C) on edge to the front of the bottom, bottoms flush. It stands ¾″ above the shelf and stops frames from sliding off. Drive four 1¼″ brad nails through it.

  4. 04

    Sand and finish

    Set and fill the nail holes. Sand with 120 then 180 grit and paint or stain to match your frames.

  5. 05

    Hang it level

    Find two studs, usually 16″ apart. Hold the ledge level and drive a 2½″ screw through the back into each stud, just above the shelf where the frames will hide the heads.

    TipHang two or three ledges about 12″ apart for a gallery wall. Use a long level so they all line up.
Build safely

Build at your own risk. Check every measurement against your own lumber before you cut, test-fit before you glue, and wear eye and ear protection. Full disclaimer.

More from Entryway & Storage

See all 10 →
Draft plan. Not yet checked by a carpenter.Plan No. 27