Woodworking plan · No. 98

Pull-Out Trash Cabinet

A freestanding 15″ kitchen cabinet that hides the trash: open the door and a 35 qt can rolls out on full-extension slides. With a counter-height top and a shelf for bags.

Skill
Level 3 of 5 · Intermediate
Build time
6 to 8 hours, plus finish
Lumber
1 1x4, 1 2x4, 1 sheet of ¾″ plywood and 1 panel of ¼″ plywood
Joinery
Pocket holes, glue, screws and brads
Finished size
16″ W × 25″ D × 36″ H
Drag to spin · pinch or scroll to zoom

What you need

Lumber sizes

A 1x4 is actually ¾″ × 3½″ and a 2x4 is 1½″ × 3½″. Every measurement in this plan uses the real size. ¾″ plywood and ¼″ plywood are drawn at full thickness, but plywood sold that way is often a hair thinner, so measure yours and cut the pieces that fit between panels to match.

Shopping list

  • 11x4, 6 ftTop stretchers.
  • 12x4, 8 ftThe base.
  • 1¾″ plywood, 4 × 8 ft sheetBirch or another smooth plywood.
  • 1¼″ plywood, 2 × 4 ft panelThe back.
  • 1Pull-out trash can kit, single 35 qtMade for a 15″ base cabinet.
  • 1Cabinet pull handle
  • 8Screws that come with the pull-outFor its base and door brackets.
  • ~301¼″ coarse-thread pocket-hole screws
  • ~103″ wood screwsFor the base.
  • ~101⅝″ wood screwsBox to base.
  • ~101¼″ wood screwsTop to stretchers.
  • ~301″ brad nailsFor the back.
  • 1Iron-on edge banding, 25 ft¾″ wide.
  • 1Furniture anti-tip kitOr screws into the cabinet beside it.
  • 1Wood glue
  • —Sandpaper, paint or stain, clear polyurethane

Tools

  • Circular sawWith a straight guide, or have the store cut the plywood.
  • Miter sawOr the circular saw, for the boards.
  • Pocket-hole jigSet for ¾″.
  • Drill/driver
  • Brad nailer or hammer
  • Clothes ironFor the edge banding.
  • Clamps
  • Tape measure, speed square, pencil

Links for the hardware and tools ↓

Cut list

Thirteen pieces from two boards and two panels. Label each piece with its letter in pencil as you cut it.

PartQtySize, inchesFrom
ASides2¾ × 23 × 31¾¾″ plywood
BBottom1¾ × 13½ × 23¾″ plywood
CShelf1¾ × 13½ × 22¾″ plywood
DDoor1¾ × 14⅞ × 31½¾″ plywood
ETop1¾ × 16 × 24½¾″ plywood
FBack1¼ × 15 × 31¾¼″ plywood
GTop stretchers2¾ × 3½ × 13½1x4
HBase front and back21½ × 3½ × 142x4
JBase sides21½ × 3½ × 18¼2x4

Board layout. Each row is one board, cut left to right, with the remainder hatched. Dark lines are saw cuts, about ⅛″ wide.

Hardware & tools

Everything besides the lumber, with a link for each.

Links go to Amazon. Woodable earns a small commission at no cost to you.

Required part

  • Pull-out trash can kit, single 35 qtCheck your pull-out's instructions for its minimum opening before you cut: this box gives 13½″ wide, 23″ deep and 30¼″ tall inside.1View on Amazon

Hardware

  • Cabinet pull handleA 4″ to 6″ pull handle with machine screws long enough for a ¾″ panel.1View on Amazon
  • Iron-on edge banding, 25 ft¾″ wide.1View on Amazon
  • Furniture anti-tip kitOr screws into the cabinet beside it.1View on Amazon

Fasteners

Glue & finish

  • Wood gluePVA wood glue for indoor projects.1View on Amazon
  • Sandpaper5″ hook-and-loop discs for a random orbit sander, 80 to 220 grit.View on Amazon
  • Clear polyurethaneWater-based polyurethane, satin, for a clear topcoat.View on Amazon
  • Wood stainOil-based or water-based interior wood stain.View on Amazon
  • Furniture paintInterior paint for furniture: chalk-style or acrylic enamel.View on Amazon

Tools

Build it

Eleven steps. The 3D view follows along as you scroll. The parts you're working on are yellow, and the pocket holes or screws for that step are red.

Step 1 of 11Cut the pieces
  1. 01

    Cut the pieces

    Check your pull-out's own instructions for the minimum opening, its screw positions and its door brackets before you cut. This box gives it 13½″ of width, 23″ of depth and 30¼″ of height.

    Cut every piece on the cut list. The store can rip the plywood into strips for you:

    • A Sides, two at 23″ × 31¾″
    • B Bottom, one at 13½″ × 23″
    • C Shelf, one at 13½″ × 22″
    • D Door, one at 14⅞″ × 31½″
    • E Top, one at 16″ × 24½″
    • F Back, one at 15″ × 31¾″
    • G Top stretchers, two at 13½″
    • H Base front and back, two at 14″
    • J Base sides, two at 18¼″
  2. 02

    Drill pocket holes and band the edges

    With the pocket-hole jig set for ¾″, drill three pocket holes along each end of the bottom (B) on its underside, two at each end of the shelf (C) on its underside, and two at each end of both top stretchers (G) on the face that will be on top.

    Iron edge banding onto the front edges of the sides (A) and the shelf (C), all four edges of the door (D), and the front and side edges of the top (E). Trim it flush.

  3. 03

    Build the base

    Stand the base sides (J) between the base front and back (H), and drive two 3″ screws through the front and back into each end. Check the diagonals match so it's square.

  4. 04

    Build the box

    Stand the two sides (A) up and glue and pocket-screw the bottom (B) between them, flush at the bottom, front and back. Pocket-screw the two top stretchers (G) between the sides at the top, one flush with the front and one flush with the back edges of the sides, pocket holes facing up.

  5. 05

    Add the shelf

    Glue and pocket-screw the shelf (C) between the sides, its top 23″ above the floor of the box and its front edge 1″ back from the front. It holds trash bags and clears the top of the can by about 3″.

  6. 06

    Nail on the back

    Lay the box face down. Measure both diagonals and push it square until they match. Glue and nail the back (F) to the sides, bottom, shelf and back stretcher with 1″ brads every 6″ or so.

  7. 07

    Set it on the base and add the top

    Stand the box on the base, flush at the back and centered side to side. The base sits 1½″ back from the front so your toes fit under the door. Drive four 1⅝″ screws down through the bottom (B) into the base.

    Lay the top (E) on, flush at the back and overhanging ½″ at each side. Screw up through the stretchers (G) into it with 1¼″ screws.

  8. 08

    Sand and finish

    Sand with 120 then 180 grit. Paint the cabinet and door, or stain them and seal with polyurethane. Three coats on the top: it gets wiped a lot.

  9. 09

    Install the pull-out

    Set the pull-out on the floor of the box, centered side to side, with its front where its instructions say for a full-overlay door. Screw it down with the screws that come with it, through the holes in its base.

    Pull it all the way out and push it back in: it should run smoothly without touching the sides or the shelf.

    Get this hardware: Pull-out trash can kit, single 35 qt

  10. 10

    Hang the door on the pull-out

    Hold the door (D) against the front of the pull-out with an even gap at the top and sides, and screw it to the pull-out's door brackets from inside. Adjust the brackets until the gaps are even. Screw a pull near the top of the door.

    Watch outWith a full can pulled out, this cabinet could tip forward. Screw it to the cabinet beside it through the side, or anchor it to a wall stud with a furniture anti-tip kit.

    Get this hardware: Furniture anti-tip kit

  11. 11

    Pull it out

    Pull the handle: the door and the can roll out together. Lift the can out of its frame to empty it.

    Watch outKeep fingers clear of the slides and the door edge as it closes.
Build safely

Build at your own risk. Check every measurement against your own lumber before you cut, test-fit before you glue, and wear eye and ear protection. Full disclaimer.

More from Kitchen & Dining

See all 12 →
Plan No. 98